Has the US-NRC withdrawn permission for plants to use CROSSFLOW for Appendix K (MUR) and Power Recovery?

No they have not.
No plant has been required to take the CROSSFLOW system out of service and no plant has been required to down-power. Those plants already licensed for MUR uprate and those using the system for Power Recovery continue to do so, with the existing Topical Report providing the licensing basis.